We have working experience of Ten states for Forest Clearance as per provision of FCA, 1980, Wild Life Act, 1972 & Indian Forest Act, 1927. We have in-depth understanding on preparing documents of NOC from National & State Wildlife Board all states of Country. The few projects are listed below:

Sl No. Project Name District State Project Area (ha.) Status
1 2×660 MW Coal based Thermal Power Project Surguja Chhattisgarh 300.08 Project Cleared
2 Hydro-structure for 2×660 MW Coal based Thermal Power Project Surguja, Koriya Chhattisgarh 58.9 Form-3 Stage
3 Transmission Line for 2×660 MW Coal based Thermal Power Project Surguja, Korba, Bilaspur, Chhattisgarh 302.7 Form-4 Stage
4 Tara Captive Coal Block for ICPL 2×660 MW Coal based Thermal Power Project Surguja Chhattisgarh 2200 Project Cleared
5 Dumri Coal Mining Project Hazaribagh Jharkhand 158.64 Project Cleared
6 Gargai drinking Water Lifting Scheme in Tansa Wildlife Sanctuary Thane Maharashtra 742.8 Project Cleared by SBWL
7 2×800 MW Basundhara Thermal Power Project Sundargarh Odisha 58.7 Form-1 Prepared
8 2×600 MW Bara-darhaa Coal based Thermal Power Project Jhanjgir-Champa Chhattisgarh 12.4 Project Cleared
9 Moher & Moher Amlohri Ext. Coal Block Singrauli MP 1064.02 Project Cleared
10 O.B. Dump and Infrastructure for Moher & Moher Amlohri Ext. Coal Block Singrauli MP 133.28 Project Cleared
11 Chhatrasal Coal Block Singrauli MP 925.10 Project Cleared
12 Siyom Hydro Electric Project Siyom Ar. Pradesh 800.00 Form-3 Stage
13 Tato Hydro Electric Project Tato Ar. Pradesh 867.20 Project Cleared
14 Keredari ‘B’ and ‘C’ captive Coal Block for Tilaiya UMPP Hazaribagh Jharkhand 850 Form-1 Prepared